Minor Works & 48-hour Notification

What is a Minor Works Approval?

The Minor Works Approval (known as Minor Works Permit) concerns small-scale construction works, mainly renovation, maintenance, and minor interventions, for which a full Building Permit is not required.

What works does it cover?

According to Article 4, paragraph 2 of Law 4076/2012 (Government Gazette 79A – NOK), the execution of the following works is permitted with a Minor Works Permit:

Indicatively:

  • Trial soil sections and excavations (with archaeological approval).
  • Installation of prefabricated houses for special social groups.
  • Pumping installations and small ancillary buildings (with approvals).
  • Water boreholes on privately owned properties.
  • Geotechnical investigations without shoring.
  • Installation of temporary structures with a static adequacy certificate.
  • Construction of an elevator for people with disabilities in existing buildings.
  • Tree cutting in permitted areas.
  • Scaffolding installation (with Health and Safety Plan and engineer supervision).
  • Installation of site offices.
  • Installation of underground tanks and gas station systems.
  • Exterior painting, plastering, railings, facade repairs.
  • Facade cladding and replacement of glass curtain walls.
  • Construction of a pergola on uncovered areas, balconies, rooftops, or verandas.
  • Installation of an uncovered swimming pool up to 50 sq.m. without heavy excavations.
  • Antenna installation.
  • Interior alterations without intervention in the structural system.
  • Construction of planted roofs.
  • Installation of external thermal insulation (e.g., under the Exoikonomo program).
  • Roof maintenance/repair.
  • Light fences and stone walls up to 1.00 m.
  • Small stone-built agricultural storage room up to 15 sq.m.
  • Construction of a hearth, oven, or fireplace (without structural intervention).
  • Roof replacement without changing dimensions.
  • Installation of solar or photovoltaic systems.
  • Functional merging of spaces (par. 10 of article 10 of the Building Code).
  • Artistic interventions.
  • Change of use in special cases of Law 3907/2011.

What is the issuance process?

The process is similar to that of a Building Permit but is simpler and requires:

  • fewer studies,
  • fewer supporting documents,
  • a shorter approval period.

Issuance is done electronically through the e-Permits system.

What should we pay attention to?

Often, a Minor Works Permit is issued, and during the course of the work, additional works are carried out that require a full Building Permit. This can lead to:

  • to delays,
  • to a double procedure,
  • to violations if works begin without a permit.

That’s why a proper initial check by your engineer regarding what is permitted and what is not, is important.